IPN Indicator and Resent
Viewing IPN Indicator in iCredit
In iCredit user management there will be an indication showing the IPN received successfully and verified.
It can also help the developer to send the IPN again if needed and see the error message if occurs.
Enter iCredit Management of the Production or Test according to the develop phase -
Go to דו"חות (Reports) -> דו"ח מכירות (Sale report)
And press on the button to show the report
The IPN indicator will show on the left
IPN button designated color -
If the color of the button is red it means that the IPN process wasn’t completed successfully (list of possible issues in the next chapter)
The red button is only an indicator from iCredit side so it is possible that the IPN message received successfully anyway.
When the IPN indicator button turns to green it means that the IPN received successfully and that Verify method in the server IPNListener process returned status “Verified”.
Resend the IPN manually -
Press on the IPN indicator button of the specific sale, after that a message will display accordingly.
Success message
Error message
The error type iCredit server received will display in the error message.
Updated about 2 months ago